• Safety Data Sheets (SDS) |
|
|
|
|
• OSHA | |
|
|
|
• P&ID | |
|
|
|
• Pressure Vessels | |
|
|
|
• Compressed Air Dryers | |
|
|
|
• Coalescing Filters | |
|
|
|
• Particle Filters | |
|
|
|
• Microns / PPM | |
|
|
|
• Nitrogen Systems Validation | |
|
|
|
• Clean Steam Validation | |
|
|
|
• Plant Steam Validation | |
|
|
|
• Boilers | |
|
|
|
• UPS Systems | |
|
|
|
• Sampling Points/Sampling Frequency/Sampling Plan | |
|
|
|
• GMP / Non-GMP Facility Qualification for: Manufacturing Rooms, Laboratories, Aseptic Areas, PI&D, Construction specifications of floors, walls ceiling and doors, Electrical/power specifications, illumination, drains, safety inspections, Environmental Monitoring, Microbiological Monitoring | |
|
|
|
• Piping specifications, dead legs, use point stations, pumps, valves, rupture disks, hydrophobic filters, heat exchangers. | |
|
|
|
• Flow meter test equipment | |
|
|
|
• Pressure Gauges test equipment | |
|
|
|
• HEPA Filters | |
|
|
|
• Environmental Areas certifications (Filter Integrity test, non-viable particle monitoring, air-flow pattern, room air changes, room’s differential pressure, Humidity and Temperature) | |
|
|
|
• Storm Sewer System | |
|
|
|
• Temperature and relative Humidity Mapping (Warehouse) | |
|
|
|
• Temperature and relative Humidity Mapping (Manufacturing and Packaging Areas) | |
|
|
|
• Building Management System (BMS/QBMS/UMS) | |
|
|
|
• Building Automation System (BAS / QBAS) | |
|
|
|
• Process Automation System (PAS) | |
|
|
|
• DPT / TT | |
|
|
|
• Smoke Test Profiles | |
|
|
|
• AHU (Air Handling Units) Validation | |
|
|
|
• HVAC Balance Reports | |
|
|
|
• Heating/Cooling Coils | |
|
|
|
• Make-up Units | |
|
|
|
• Ducts construction/ modification (including supplies and returns) | |
|
|
|
• Chillers | |
|
|
|
• Cooling Tower | |
|
|
|
• Pumps | |
|
|
|
• Reheat Water Plate Heat Exchangers | |
|
|
|
• WFI Distribution System and Loop Validation | |
|
|
|
• USP Water Distribution System and Loop Validation | |
|
|
|
• Potable Water Distribution System and Loop Validation | |
|
|
|
• Purified Water Distribution System and Loop Validation | |
|
|
|
• DI Water Loop Validation | |
|
|
|
• ROW Loop Validation | |
|
|
|
• Pre-treatment Loop (RO units, Ozone systems, UV Light, Multimedia filters, Carbon Filters) | |
|
|
|
• CDI, Chlorine Injection Unit, Metabisulfite Injection Units, Tanks | |
|
|
|
• Compressed Air Distribution System | |
|
|
|
• Compressed Air Dryers | |
|
|
|
• CFM’s | |
|
|
|
• Dew Point | |
|
|
|
• Hygrometers | |
|
|
|
• Automatic Ball Valves | |
|
|
|
• Argon Systems Validation | |
|
|
|
• Other | |
|
|
|